Skip to content
Tiatra, LLCTiatra, LLC
Tiatra, LLC
Information Technology Solutions for Washington, DC Government Agencies
  • Home
  • About Us
  • Services
    • IT Engineering and Support
    • Software Development
    • Information Assurance and Testing
    • Project and Program Management
  • Clients & Partners
  • Careers
  • News
  • Contact
 
  • Home
  • About Us
  • Services
    • IT Engineering and Support
    • Software Development
    • Information Assurance and Testing
    • Project and Program Management
  • Clients & Partners
  • Careers
  • News
  • Contact

Amazon claims its data centers are 7x more water-efficient than the industry average

As they face increasing backlash over their resource consumption, major data center operators are scrambling to prove they’re not a drain on the environment, or, at least, not as much of one as their competition.

Amazon has published some bold new claims to this end: The tech giant says it has achieved a 52% improvement in water efficiency over the last 5 years, and says its data centers are 7x more water-efficient than the industry average.

This, the company says, is thanks to a mix of innovative methods, including free air and evaporative cooling, and increased temperature thresholds.

The announcement underscores the importance of disclosure in the AI era, and signals that technology is no longer the sole differentiator, said Sanchit Vir Gogia of Greyhound Research. “Water efficiency has become a front in hyperscale competition, not a footnote.”

How Amazon is reducing its water consumption

Amazon’s global data center operations used 0.12 liters of water per kilowatt-hour (L/kWh) in 2025, compared to the industry average of 0.84 L/kWh, a 7x lead, the company says.

Its closest competition was Microsoft, which used 0.27 L/kWh in 2025, dropping from .30 in 2024. Google seems to be the heaviest user in recent years (averaging 1.15 L/kWh), while Meta has hovered around .20 L/kWh.

Amazon employs a multiple methods to garner these results, it says.

Firstly, roughly 90% of the time the company uses “free air cooling,” pulling outside air into data centers, letting the air absorb heat, then pumping it back outside, with no water required. Amazon likens it to opening the windows on a summer evening rather than running the air conditioner.

When temperatures rise, Amazon uses evaporative cooling. Water is sprayed onto an absorbent medium and air is allowed to flow through it. The water evaporates and pulls heat from the air, cooling it by 5 to 10 degrees Fahrenheit.

Further, the company has been deliberately raising the thresholds at which its centers operate, designing servers that can tolerate more heat, thus reducing water needs. After a few years of “iteration, learning, and adjusting,” Amazon has raised the operating temperature to 85° F.

Reclaiming water, partnering on community projects

In 2025, Amazon says it returned 3 US gallons of water to local communities for every 4 gallons used, and is 75% of the way towards its goal of being water positive by 2030, where every gallon used will be returned in kind.

The company uses reclaimed water sourced from wastewater treatment plants, as opposed to potable water, across 130 of its data centers, with 26 facilities using this method exclusively. Additionally, it is helping communities develop reclaimed water programs that could return more than 5.8 billion US gallons annually.

Amazon is particularly focusing on areas where water is scarce, and aims to partner with communities “to ensure our water stewardship creates local benefits that they want to see,” the company says.

Not hollow claims, but there are nuances

“The gains are certainly real and the engineering is legitimate, so Amazon earns credit here,” said Matt Kimball, VP and principal analyst at Moor Insights & Strategy.

The 0.12 figure is Water Usage Effectiveness (WUE), which measures the water used at the data center per kilowatt-hour of IT load. The metric was introduced by Green Grid and is widely accepted as the standard, he explained.

Still, it can be difficult to be precise in these measurements, and there are nuances: Is a data center operator only reporting WUE? Do they count the water used to generate electricity (most actually don’t)? Is reclaimed water being counted in the waysame as potable?

But “to Amazon’s credit, they aren’t just shifting the burden elsewhere,” Kimball noted.

Free air cooling and higher operating temperature thresholds reduce both water and energy consumption, and Amazon’s power usage effectiveness (PUE), the standard metric for measuring data center efficiency, sits around 1.15.

“This means they’re not achieving this strong water number at the expense of a weak energy number,” Kimball said.

Not a secret recipe

While the gains are impressive, the techniques Amazon highlights are increasingly becoming standard practices, Kimball pointed out.

“Amazon is on the leading edge, but it’s not a secret recipe,” he said. What sets the company apart is scale, execution, facility design, geographic mix, and its aggressive pursuit of energy goals.

Others are doing the similar things, if through different avenues: Microsoft is investing in closed-loop cooling systems that dramatically reduce evaporative water loss. Google is heavily focused on reclaimed water and using AI to optimize data centers. Meta has long relied on outside-air cooling. And overall, the industry is moving toward liquid cooling for dense AI deployments, “which changes the water equation again,” said Kimball.

One of the big variables is location: Climate influences water efficiency, so where a company builds its infrastructure is as important as its cooling methods. Further, power-consumptive AI changes the discussion, he emphasized; traditional enterprise workloads and dense AI training clusters create very different thermal profiles.

“The industry is still working through what the long-term water and energy balance looks like as AI infrastructure scales,” Kimball said.

The disclosure arms race

As Gogia noted, what separates operators now is disclosure.

For instance, Microsoft has committed to publishing water data for every US data center region, while Equinix reports a portfolio figure of 0.91 L/kWh and 1.41 L/kWh for its evaporative-cooled sites, which is a “boundary discipline most of the market has yet to adopt,” said Gogia.

The next phase of cloud competition will be won on transparency, not just thermodynamics, he contended. “Operators that disclose region by region will expand faster, permit easier and litigate less.” In fact, his firm expects water disclosure to become a standard line item in cloud and AI infrastructure RFPs within 12 to 24 months.

CIOs should demand region-level withdrawal and consumption data, source-water mix, cooling architecture by region, drought contingency plans, and a “clean separation between operational efficiency and replenishment accounting,” Gogia advised.

Meanwhile, the timing of this reporting tells its own story: Amazon published these figures two days after its home city Seattle put a one-year freeze on new large data centers, citing water use as a big concern. Further, more than 70 US jurisdictions now have temporary or permanent restrictions, and the European Commission is preparing efficiency standards with water criteria.

So, this can be construed as a sustainability report as much as a “social-license counteroffensive,” said Gogia.

AI is changing the game entirely

Buyers should care about these developments for practical reasons beyond environmental, social, and governance (ESG) reporting, Kimball said.

First, water is becoming a real constraint on where data centers can be built, and communities are pushing back on development. This can impact capacity, expansion timelines, and operating costs in high-demand markets, he said.

Second, a cloud provider’s water footprint increasingly becomes part of a customer’s own sustainability profile. Therefore, organizations with environmental reporting requirements or water-related goals are paying closer attention to the resource consumption of the infrastructure supporting their apps and AI workloads.

Ultimately, Gogia noted, data centers are no longer invisible infrastructure: They are becoming contested civic infrastructure.

“The winners will treat water as a shared public constraint rather than a line item in sustainability theater,” he said. “The future of AI infrastructure will be decided as much by resource stewardship as by engineering capability.”

This article originally appeared on NetworkWorld.


Read More from This Article: Amazon claims its data centers are 7x more water-efficient than the industry average
Source: News

Category: NewsJune 12, 2026
Tags: art

Post navigation

PreviousPrevious post:Oracle wades into outcome-based AI billing watersNextNext post:AIはコードを書ける、だがオペレーティングモデルを管理するのはCIOだ

Related posts

6 new rules of IT leadership — and what they replace
July 6, 2026
AI doesn’t eliminate inefficiency. It amplifies it
July 6, 2026
Playing to win at the AI casino
July 6, 2026
시스코, 사내 AI 비서로 ‘섀도 AI’ 차단…직원당 주 5~6시간 업무 절감
July 6, 2026
벤더 종속 vs 빠른 구축…MS·AWS FDE 도입 전 따져볼 것들
July 6, 2026
채용·출장비 줄인 SAP, AI 투자 재원 확보 나서
July 6, 2026
Recent Posts
  • 6 new rules of IT leadership — and what they replace
  • Playing to win at the AI casino
  • AI doesn’t eliminate inefficiency. It amplifies it
  • 시스코, 사내 AI 비서로 ‘섀도 AI’ 차단…직원당 주 5~6시간 업무 절감
  • 벤더 종속 vs 빠른 구축…MS·AWS FDE 도입 전 따져볼 것들
Recent Comments
    Archives
    • July 2026
    • June 2026
    • May 2026
    • April 2026
    • March 2026
    • February 2026
    • January 2026
    • December 2025
    • November 2025
    • October 2025
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • March 2017
    • February 2017
    • January 2017
    Categories
    • News
    Meta
    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    Tiatra LLC.

    Tiatra, LLC, based in the Washington, DC metropolitan area, proudly serves federal government agencies, organizations that work with the government and other commercial businesses and organizations. Tiatra specializes in a broad range of information technology (IT) development and management services incorporating solid engineering, attention to client needs, and meeting or exceeding any security parameters required. Our small yet innovative company is structured with a full complement of the necessary technical experts, working with hands-on management, to provide a high level of service and competitive pricing for your systems and engineering requirements.

    Find us on:

    FacebookTwitterLinkedin

    Submitclear

    Tiatra, LLC
    Copyright 2016. All rights reserved.