Skip to content
Tiatra, LLCTiatra, LLC
Tiatra, LLC
Information Technology Solutions for Washington, DC Government Agencies
  • Home
  • About Us
  • Services
    • IT Engineering and Support
    • Software Development
    • Information Assurance and Testing
    • Project and Program Management
  • Clients & Partners
  • Careers
  • News
  • Contact
 
  • Home
  • About Us
  • Services
    • IT Engineering and Support
    • Software Development
    • Information Assurance and Testing
    • Project and Program Management
  • Clients & Partners
  • Careers
  • News
  • Contact

Data center design in the age of AI: Integrating AI with legacy Infrastructure

In the age of artificial intelligence (AI), how can enterprises evaluate whether their existing data center design can fully employ the modern requirements needed to run AI? There are major considerations as IT leaders develop their AI strategies and evaluate the landscape of their infrastructure.

This blog examines:

  • What is considered legacy IT infrastructure?
  • How to integrate new AI equipment with existing infrastructure.
  • Evaluating data center design and legacy infrastructure.
  • The art of the data center retrofit.

Though AI workflows raise new challenges and questions around unique power and cooling needs, IT leaders should evaluate the state of their data center design to fit the needs of emerging and evolving modern needs.

What is legacy IT infrastructure?

Identifying legacy infrastructure is part intuition and part experience. From the perspective of IT equipment, we could assume that anything that is not at the bleeding edge is legacy. However, this is often not true.

Many of the world’s IT systems do not run on the latest and greatest hardware. This will continue due to the typical budget, spending, and equipment update cycles of everyone from the hyperscale cloud to small enterprise.

Even in the age of AI, not every rack will be drawing 100 kW or need liquid cooling. Racks full of network, memory aggregation, or storage appliances may still be below 15 kW each and reliant on air cooling.

It becomes challenging to classify IT infrastructure as legacy or not based on its power draw alone. Various industry benchmarks show that new generations of central processing units (CPUs), graphics processing units (GPUs), network equipment, and other IT infrastructure assets are significantly faster than their predecessors, but this alone is often not enough to designate existing equipment as legacy infrastructure.

The best test is to decide whether current infrastructure is holding back the development and operational activities of the organization in ways that new generations of equipment would not.

If it does, it should be classified as legacy infrastructure.

Integrating AI with existing IT infrastructure

In the case of IT equipment, we can think of integrating AI as either utilizing existing servers and their supporting equipment to perform new AI functions or augmenting hardware deployed with new AI-specific equipment to perform new AI functions.

An example of the latter is taking an existing rack of CPU-based servers and adding two new GPU-based servers to provide more parallel computing muscle to launch a chatbot to a company’s internal users.

This may seem easier than accommodating a new AI high-density deployment, but it comes with three sets of challenges:

  1. Adding GPU-based servers to an otherwise low rack density aisle may create hot spots that the building’s cooling system was not originally designed to handle.
  2. It may create uneven power loads across the facility and lead to the need to reallocate backup power resources.
  3. It may lead to network congestion as the new equipment multiplies the data transferred per rack.

These factors can lead to new pressure on the data center, which you should consider as part of your IT stack itself.

Evaluating data center design and legacy infrastructure

The data center is as much a piece of your IT infrastructure as the servers that you deploy in it, and so we should consider how this concept of legacy infrastructure applies to the data center facility as well.

In technology terms, the data center industry is no spring chicken. Digital Realty alone supports around 2.4 gigawatts of customer IT equipment globally, and this didn’t happen overnight.

Since our founding in 2004, we have incrementally added to our global data center capacity each year, and all of the customer equipment in those facilities doesn’t go away. Many organizations replace all their servers every three to five years, but some servers may be deployed for up to eight years. When equipment is replaced, it’s done in phases, so that the organization’s applications operate without real downtime.

What this means is that the data center is always on. A data center operator can’t simply lift all its customers’ IT equipment out, perform a wholesale upgrade of the facility, and then put it all back in. As time passes, the mix of customer equipment in the data center will typically contain some legacy and some non-legacy equipment.

Additionally, as the data center facility itself ages, some of its own characteristics, such as its airflow design, floor construction, and support for liquid cooling, may not be ideally suited to all the equipment that customers want to deploy.

For example, many data center facilities use a raised floor design— AI equipment drives higher rack densities not just in terms of power draw, but also because of their weight. In some cases, these racks can need a solid concrete slab floor.

This means that for certain use cases, some data centers can fit our definition of legacy infrastructure.

However, a well-designed data center is far more flexible regarding upgrades over time than a server or set of IT equipment across multiple racks. A data center may last over 15 to 20 years, depending on how well the operator designs, retrofits, and modularizes it over time.

AI has prompted a sea change in rack densities and other requirements that impact the data center. Often the data center operator can upgrade parts of the facility to accommodate these new needs.

The art of the data center design retrofit

This process is known as retrofitting, and the art of the retrofit is a key component in how effective the data center operator is in designing data centers for current and future generations of servers and other IT infrastructure. Imagine an older data center facility originally designed for 10 kW per rack on average. With the emergence of AI, that same facility may be expected to support 100 kW per rack without the luxury of a total shutdown and ground-up redesign.

The flexibility to support these types of changes to the data center over time is a key part of how we design and operate our data centers. For example:

  • Where a raised floor is no longer needed, it can be filled in.
  • Where liquid cooling is required, we can run piping from a new chiller unit and reservoir to the rack.
  • Where new network capabilities are required, we can bring in additional connectivity and optimize all of the network assets inside the facility itself to match.

Digital Realty CTO Chris Sharp, “The Benefits of Digital Realty’s Modular Design Approach”

Today, the data center is as flexible, modular, and highly tuned to evolve with the needs of its customers as any other part of your IT stack is. The requirements to support AI in the data center are certainly challenging, and we analyze all our data centers globally to stay on top of how to evolve our design and operations to accommodate developing AI requirements.

Empower your IT strategy with future-proofed AI-ready infrastructure. Download our AI for IT Leaders whitepaper.



Read More from This Article:
Data center design in the age of AI: Integrating AI with legacy Infrastructure
Source: News

Category: NewsJune 24, 2024
Tags: art

Post navigation

PreviousPrevious post:Harness AI’s potential and navigate disruption with Digital RealtyNextNext post:How PlatformDIGITAL® enables private AI

Related posts

칼럼 | 멀티 벤더 프로젝트 실패, 대부분은 ‘거버넌스’에서 시작된다
April 29, 2026
샤오미, MIT 라이선스 ‘미모 V2.5’ 공개···장시간 실행 AI 에이전트 시장 겨냥
April 29, 2026
SAS makes AI governance the centerpiece of its agent strategy
April 29, 2026
The boardroom divide: Why cyber resilience is a cultural asset
April 28, 2026
Samsung Galaxy AI for business: Productivity meets security
April 28, 2026
Startup tackles knowledge graphs to improve AI accuracy
April 28, 2026
Recent Posts
  • 칼럼 | 멀티 벤더 프로젝트 실패, 대부분은 ‘거버넌스’에서 시작된다
  • 샤오미, MIT 라이선스 ‘미모 V2.5’ 공개···장시간 실행 AI 에이전트 시장 겨냥
  • SAS makes AI governance the centerpiece of its agent strategy
  • The boardroom divide: Why cyber resilience is a cultural asset
  • Samsung Galaxy AI for business: Productivity meets security
Recent Comments
    Archives
    • April 2026
    • March 2026
    • February 2026
    • January 2026
    • December 2025
    • November 2025
    • October 2025
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • June 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • September 2020
    • August 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • January 2020
    • December 2019
    • November 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • March 2017
    • February 2017
    • January 2017
    Categories
    • News
    Meta
    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    Tiatra LLC.

    Tiatra, LLC, based in the Washington, DC metropolitan area, proudly serves federal government agencies, organizations that work with the government and other commercial businesses and organizations. Tiatra specializes in a broad range of information technology (IT) development and management services incorporating solid engineering, attention to client needs, and meeting or exceeding any security parameters required. Our small yet innovative company is structured with a full complement of the necessary technical experts, working with hands-on management, to provide a high level of service and competitive pricing for your systems and engineering requirements.

    Find us on:

    FacebookTwitterLinkedin

    Submitclear

    Tiatra, LLC
    Copyright 2016. All rights reserved.